Another strong showing from the KFW team, this time at Geraldton Port for the Mid West Ports Authority.
We were engaged to remove and replace over 400 metres of fencing within an operational section of the port – a challenging environment with high traffic and strict safety protocols.
Given the coastal location and exposure to salt-laden air, durability was key. All steelwork for the new chainmesh fencing was manufactured using 316 stainless steel to withstand the corrosive environment and ensure longevity.
Appreciate the opportunity to work alongside the team at MWPA and their support in sequencing works to allow us to deliver the project safely and on time.